What does Morvena need to prepare an accurate quotation?
A good project file does not need to define the entire coating system in technical detail. What we primarily need is a clear picture of the components, substrate, intended result, use, quantities and programme. Morvena translates that information into the necessary preparation and a suitable coating build-up. The clearer the starting information, the fewer assumptions the quotation requires and the lower the risk of surprises during production.
1. Provide an overview of components and substrates
Include drawings, a bill of quantities or a parts list with recognisable codes, quantities and dimensions. State the material for each component and, where relevant, the board construction, veneer or timber species. Also describe the condition in which parts will arrive: raw, pre-sanded, primed, assembled or disassembled. Explicitly mention existing coatings, repairs, glue residue, silicone or other possible contamination. You do not need to prescribe every preparation step; we mainly need to know what has already been done and what you expect Morvena to provide.
2. Describe the intended appearance as specifically as possible
State whether the intended finish is opaque, clear, stained, oiled, textured, patinated or metallic. Where possible, include a RAL, NCS or other colour reference and specify the intended gloss, texture, grain appearance or variation. Photographs, material samples or an existing component can help, but identify which reference takes precedence if several sources do not match completely. Digital images always depend on the screen, lighting and photography.
3. Mark what is visible and what must be finished
Mark primary visible faces, secondary faces, interiors, exposed edges and end grain on the drawing or photograph. Also identify areas that must remain uncoated for joints, bonding, hardware or installation. For assembled components, state what can be disassembled. We then determine how the components can be hung, supported or masked during finishing. This allows us to assess the true scope of the work.
4. Explain the use and required performance
Tell us where and how the finished component will be used. Consider interior or exterior use and exposure to moisture, cleaning products, heat, sunlight, chemicals, scratching or impact. You do not need to prescribe a product or coating build-up: Morvena proposes a system suited to the use. Where demonstrable or certified performance is required, state the applicable standard, class or project requirement so that we can establish which complete build-up and documentation are needed.
5. Explain how the appearance will be approved
Tell us whether an existing reference, an agreed trial or a first finished component should serve as the visual benchmark. A trial is not necessary for every commission and forms part of the project only when agreed. If special assessment conditions or exceptionally strict tolerances apply to colour, gloss, texture or surface quality, mention them at the enquiry stage. We can then discuss what is feasible and which additional preparation, checks or iterations will be required.
6. State quantities, programme and logistics
Provide quantities by type, any spare pieces, the required delivery date and phasing. Also state the installation sequence if it affects production order. Agree with us who will handle packaging, transport, unloading and any installation. If later repeat orders are expected, mention this early: material, colour and gloss can vary between production runs. We can then decide together whether a retained reference, spare components or a suitable batch arrangement would be useful.
Drawings, bill of quantities or parts list · recognisable codes · material and delivery condition · quantities and dimensions · visible faces, edges and uncoated areas · intended colour, gloss and effect · use and required performance · relevant references · programme, packaging and transport.
Not every choice has been made yet? Mark the open points and involve us early; we will help resolve them technically and practically.
Send changes as a clearly identified new version
Resend amended drawings, bills of quantities or references with a clear date or version number and briefly list what changed. Link any approved trial, colour reference or first component to that same version. This helps everyone avoid using superseded information for the quotation or production. Morvena can also help record the relevant finishing information in a clear format.